PCC road works enquiry - FB015133481-1

Reported in the Road works category anonymously at 16:51, Wednesday 9 September 2020

Sent to Peterborough City Council less than a minute later. Council ref: 2286770.

Burton Street was resurfaced last Friday and today (Friday 7th Sept) lining works were completed. However 1 or 2 drains along the street and the fire hydrant outside 9 Burton Street are still covered with tarmac. Also the double yellow lines at the top of the street haven't been painted.